A Tale of Two Partners
August 11, 2024
On a recent Saturday morning, one partner hung drywall in the brewery.

Another effed around.

OK, it just looks like effing around. I’m starting final assembly on the grant fountain; today I installed the water manifold in its final position. It’s in a spot that’s awkward to reach from in front of the fountain, as the brackets mount about 6 ft above the floor, and a 2 ft horizontal reach beyond the grant itself. Fortunately if not intentionally, the access doors in the brick are big enough for me to weasel through, so I could get everything fit together without risking a ladder-based mishap. Reassembling the rest of the fountain works will be relatively quick and simple now that the big pieces are in place. Can’t wait to fire it up!


Sure, it’s not as essential as drywall, but it *is* awfully cool looking.